The 2-Minute Rule for b52
6 billion effort is named the Industrial Motor Substitute Application. The Air Power expects the main check B-52J will start out ground and flight exams in late 2028, and For additional B-52s to receive new engines all over the 2030s.USAF B-52H Stratofortress TF33 turbofan engines The 8 engines in the B-fifty two are paired in pods and suspended by